400 kV Engineering
Transmission-level substation project and engineering scope.
The current SAGEM production package verifies 400 kV substation capability and two ongoing 400 kV DGES substation assignments.

Transmission-level substation project and engineering scope.
Grid-connection studies integrated with the project process.
Tender documents, quantities, cost estimates, specifications and cost optimization.
Site consultancy, commissioning, provisional and final acceptance support.
Share your project scope and let SAGEM Engineering start the technical review and quotation process.