400 kV · TRANSMISSION-LEVEL INFRASTRUCTURE

400 kV Substation Design

The current SAGEM production package verifies 400 kV substation capability and two ongoing 400 kV DGES substation assignments.

Home / 400 kV Substation Design
Representative 400 kV substation engineering sector image
ENGINEERING SCOPE

Service scope verified in the production package.

01

400 kV Engineering

Transmission-level substation project and engineering scope.

02

Grid Connection

Grid-connection studies integrated with the project process.

03

Tender & Cost

Tender documents, quantities, cost estimates, specifications and cost optimization.

04

Site & Acceptance

Site consultancy, commissioning, provisional and final acceptance support.

PROJECT / REFERENCE EVIDENCE

Verified records from the production portfolio.

ONGOING400 kV KÖSE DGES150 MW · Substation · Gümüşhane
ONGOING400 kV ÇEVİRMETEPE DGES150 MW · Substation · Siirt

Discuss your project with our engineering team.

Share your project scope and let SAGEM Engineering start the technical review and quotation process.

Request a Quote